First Presbyterian Church of Santa Monica
Sanctuary Renovation
Santa Monica, CA
Cost: $2.1 Million
Completed: 2007
Installed New custom built 30' x 9' insulated glass skylight and installed new single ply roof membrane over 6" rigid insulation. Removed existing mansard roof clay tile and installed new custom colored standing seamed metal roof, removed original stained glass panels and installed new window system. Added steel entrance canopy complete with new down lights, standing seam metal roof and plaster ceiling. The existing interior ceiling plaster and lighting fixtures were removed and replaced with a new two layer drywall ceiling and over 120 down lights spaced in a random pattern.. The original Chancel wall and fabric system was removed and replaced with a new wall and fabric system utilizing new sound transmission material. Interior storage spaces were added and new 1876 square upper balcony with audio visual mixing console along with a new fire alarm system. Added 5 new HVAC roof top units with roof mounted duct work running along roof and down new interior shafts for air distribution. Provisions were made in the ductwork for future sound suppression system.