Aquarium of the Pacific
Animal Care Center
Long Beach, CA
Cost: $2.1 Million
Completed: March 2010
TG’s 5th LEED Platinum Project
The new 14,000-square-foot Molina Animal Care Center at the Aquarium of the Pacific was TG Constructions 5th Platinum LEED Project. The project incorporated photovoltaic panels for electrical energy production as well as used existing chilled water for the cooling system at its outdoor tanks.