TRW
M-4 High Bay Annex
Redondo Beach, California

Cost: $5.5 Million
Completed: 2002

New facility, satellite manufacturing and assembly. Construction of a 10,500 SF high bay, class 100,000 clean room facility. Structural steel frame with metal siding, roof equipment platforms, and 20-ton overhead bridge crane with an 82' span. Ceiling height of clean room is 75'. Building is supported on engineered fill with cast-in-place concrete piles.